About 20 TAPP group members worked for several hours on April 17th 2019 installing coconut fibre Coir logs at the TS Onslow Navy Cadet site at Golden Beach, Caloundra. The Coir logs are anchored in the shore embankment by wooden stakes and are designed to fill with sand as the tidal waters rise and fall in the Pumicestone Passage.
Coir Log Installation Work Bee
- Post author:Carla Clynick
- Post published:April 17, 2019
- Post category:Uncategorised
- Post comments:0 Comments